How much consideration is given to soft affinity for consolidation? #7133
Labels
documentation
Improvements or additions to documentation
needs-triage
Issues that need to be triaged
Description
I have read document consolidation, but there is something I would like to ask about.
In the process of node consolidation, should the controller focus on minimizing costs or balance cost reduction with maximizing the satisfaction of
preferredDuringSchedulingIgnoredDuringExecution
constraints?Consolidation is designed to group nodes to achieve the lowest possible cost. However, the level of consideration given to
preferredDuringSchedulingIgnoredDuringExecution
is less clear. WhilerequiredDuringSchedulingIgnoredDuringExecution
mandates strict adherence during consolidation,preferredDuringSchedulingIgnoredDuringExecution
only represents a preference and is not strictly enforced.The text was updated successfully, but these errors were encountered: