Skip to content

Latest commit

 

History

History
27 lines (21 loc) · 2.11 KB

GROWTH_PLAN_TEMPLATE.md

File metadata and controls

27 lines (21 loc) · 2.11 KB

${PROJECT} Growth Plan

Note: the purpose of the growth plan is to provide a roadmap for a project to move from Growth stage to Impact stage.

Growth stage requirements

Note: in theory, Growth stage requirements should already be met by all Growth stage projects. As requirements might have changed after a project was accepted at the Growth stage, this isn't necessarily always the case. So making sure that all Growth requirements are met is a good first step in any Growth plan.

Requirement Current status Desired status Plan Timeline Completed
Project shows substantial adoption in production environments or usage within the ecosystem {CURRENT_STATUS} 2 {PLAN} {DATE}
Substancial ongoing flow of commits and merged contributions. {CURRENT_STATUS} {DESIRED_STATUS} {PLAN} {DATE}
Sufficient level of community participation to meet goals outlined in growth plan. {CURRENT_STATUS} {DESIRED_STATUS} {PLAN} {DATE}
Accepts security reports and publicly disclose them after the fix has been made available. {CURRENT_STATUS} {DESIRED_STATUS} {PLAN} {DATE}

Impact stage requirements

Requirement Current status Desired status Plan Timeline Completed
Governing body of >= 5 members of which no more than 1/3 is affiliated with the same employer. {CURRENT_STATUS} {DESIRED_STATUS} {PLAN} {DATE}
Publicly documented governance, decision-making, contribution, and release processes. {CURRENT_STATUS} {DESIRED_STATUS} {PLAN} {DATE}
Healthy number of regular committers from at least two organizations. {CURRENT_STATUS} {DESIRED_STATUS} {PLAN} {DATE}
Adopted the Foundation Code of Conduct. {CURRENT_STATUS} {DESIRED_STATUS} {PLAN} {DATE}
Public list of project adopters. {CURRENT_STATUS} {DESIRED_STATUS} {PLAN} {DATE}
{OTHER_METRICS_DEFINED_WITH_CPC} {CURRENT_STATUS} {DESIRED_STATUS} {PLAN} {DATE}