Skip to content

fix: use cut-over-lock-timeout for instant DDL #999

fix: use cut-over-lock-timeout for instant DDL

fix: use cut-over-lock-timeout for instant DDL #999

Re-run triggered November 7, 2024 17:57
Status Failure
Total duration 1m 16s
Artifacts

replica-tests.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (mysql-5.7.25)
Process completed with exit code 1.
build (PerconaServer-8.0.21)
The job was canceled because "mysql-5_7_25" failed.
build (PerconaServer-8.0.21)
Process completed with exit code 1.
build (mysql-8.0.16)
The job was canceled because "mysql-5_7_25" failed.
build (mysql-8.0.16)
The operation was canceled.